| 1 | Know how to comply with relevant legislation and official guidance when contributing to setting out basic masonry structures. | 1.1 | Describe the different types of instruction used with the method/procedure to contributing to setting out basic masonry structures. |
| 1.2 | Describe their responsibilities under current legislation and official guidance whilst working: – in the workplace, below ground level, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting. |
| 1.3 | Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative. |
| 1.4 | State what the accident reporting procedures are and who is responsible for making reports. |
| 2 | Maintain safe working practices when contributing to setting out basic masonry structures. | 2.1 | Use personal protective equipment (PPE) safely to carry out the activity in accordance with legislation and organisational requirements when contributing to setting out basic masonry structures. |
| 2.2 | Explain why and when personal protective equipment (PPE) should be used, relating to contributing to setting out basic masonry structures, and the types, purpose and limitations of each type. |
| 2.3 | State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards. |
| 3 | Select the required quantity and quality of resources for the methods of work to contribute to setting out basic masonry structures. | 3.1 | Describe the characteristics, quality, uses, limitations and defects associated with the resources in relation to: – timber for profiles, fixings – hand tools and setting out equipment. |
| 3.2 | Select resources associated with own work in relation to materials, components, fixings, tools and setting out equipment. |
| 3.3 | State how the resources should be used correctly. |
| 3.4 | Outline potential hazards associated with the resources and method of work. |
| 3.5 | Describe how to calculate quantity, length and area associated with the method/procedure to contribute to setting out basic masonry structures. |
| 4 | Minimise the risk of damage to the work and surrounding area when contributing to setting out basic masonry structures. | 4.1 | Protect the work and its surrounding area from damage. |
| 4.2 | Minimise damage and maintain a clean work space. |
| 4.3 | Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions. |
| 4.4 | Dispose of waste in accordance with legislation. |
| 4.5 | State why the disposal of waste should be carried out in relation to the work. |
| 5 | Complete the work within the allocated time when contributing to setting out basic masonry structures. | 5.1 | Demonstrate completion of the work within the allocated time. |
| 5.2 | State the purpose of the work programme and explain why deadlines should be kept in relation to agreed starting and finishing times. |
| 6 | Comply with the given contract information to contribute to setting out basic masonry structures to the required specification. | 6.1 | Demonstrate the following work skills when contributing to setting out basic masonry structures: – measuring, marking out, levelling, positioning and securing. |
| 6.2 | Assist in setting out basic building structures to contractor’s working instructions to: – determine dimensions – construct and position profiles – position ranging lines – transfer levels. |
| 6.3 | Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to: – assist with setting out basic building structures – construct and position profiles – position ranging lines – transfer levels – use hand tools and setting out equipment. |
| 6.4 | Safely use and store hand tools and ancillary equipment. |
| 6.5 | State the needs of other occupations and how to communicate within a team when contributing to setting out basic masonry structures. |
| 6.6 | Describe how to maintain the tools and equipment used when contributing to setting out basic masonry structures. |