| 1 | Interpret the given information relating to the use of remotes and/or pedestrian-operated demolition plant when demolishing structures. | 1.1 | Interpret and extract relevant information from drawings, specifications, schedules, method statements, risk assessments and manufacturers' information. |
| 1.2 | Comply with information and/or instructions derived from risk assessments and method statements. |
| 1.3 | State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented. |
| 1.4 | Describe different types of information, their source and how they are interpreted in relation to: – drawings, specifications, schedules, method statements, risk assessments, manufacturers' information, regulations governing the operation of plant or machinery. |
| 2 | Organise with others the sequence and operation in which demolition operations using remote and/or pedestrian operated demolition plant are to be carried out. | 2.1 | Organise the work according to given information or instructions. |
| 2.2 | Describe how to communicate ideas between team members. |
| 2.3 | Organise and communicate with team members and other associated occupations. |
| 2.4 | State how to organise resources prior to and during demolition operations. |
| 3 | Know how to comply with relevant legislation and official guidance to carry out demolition operations using remote and/or pedestrian-operated demolition plant. | 3.1 | Describe their responsibilities under current legislation and official guidance whilst working: – in the workplace, below ground level, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting. |
| 3.2 | Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative. |
| 3.3 | Explain what the accident reporting procedures are and who is responsible for making reports. |
| 4 | Maintain safe working practices when carrying out demolishing operations using remote and/or pedestrian-operated demolition plant. | 4.1 | Use health and safety control equipment safely to carry out the activity in accordance with legislation and organisational requirements when demolishing structures using remote and/or pedestrian-operated demolition plant. |
| 4.2 | Explain why and when health and safety control equipment, identified by the principles of protection, should be used, relating to demolishing structures using remote and/or pedestrian-operated demolition plant, and the types, purpose and limitations of each type, the work situation and general work environment, in relation to: – collective protective measures – personal protective equipment (PPE) – respiratory protective equipment (RPE) – local exhaust ventilation (LEV). |
| 4.3 | Describe how the relevant health and safety control equipment should be used in accordance with the given instructions. |
| 4.4 | State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards. |
| 5 | Request and select the required quantity and quality of resources to carry out demolishing operations using remote and/or pedestrian-operated demolition plant. | 5.1 | Request and select resources associated with own work in relation to consumables, materials, attachments, tools, accessories and/or ancillary equipment. |
| 5.2 | Describe the characteristics, quality, uses, limitations and defects, and how they should be used correctly, associated with the resources relating to: – consumables, lubricants, fuels – spill kits – demolition plant, machinery or attachments – hand tools, ancillary equipment and/or accessories. |
| 5.3 | Describe how the resources should be used correctly and how problems associated with the resources are reported. |
| 5.4 | Explain why the organisational procedures have been developed and how they are used for the selection of required resources. |
| 5.5 | Describe any potential hazards associated with the resources and method of work. |
| 5.6 | Describe how to estimate weight, quantity, length and area associated with the method/procedure to operate plant or machinery to demolish structures and segregate, stockpile, remove and load materials. |
| 6 | Minimise the risk of damage to the work and surrounding area when demolishing structures using remote and/or pedestrian-operated demolition plant. | 6.1 | Protect the work and its surrounding area from damage in accordance with safe working practices and organisational procedures. |
| 6.2 | Minimise damage and maintain a clean work space. |
| 6.3 | Dispose of waste in accordance with legislation. |
| 6.4 | Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions. |
| 6.5 | Explain why the disposal of waste should be carried out safely in accordance with environmental responsibilities, organisational procedures, manufacturers’ information, statutory regulations and official guidance. |
| 7 | Complete the work within the allocated time when demolishing structures using remote and/or pedestrian-operated demolition plant. | 7.1 | Demonstrate completion of the work within the allocated time. |
| 7.2 | State the purpose of the work programme and describe why deadlines should be kept in relation to: – types of progress charts, timetables and estimated times – organisational procedures for reporting circumstances which will affect the work programme. |
| 8 | Comply with the given contract information to demolish structures using remote and/or pedestrian-operated demolition plant to the required specification. | 8.1 | Demonstrate the following work skills when demolishing structures using remote and/or pedestrian-operated demolition plant: – adjusting, checking, communicating, manoeuvring, positioning, demolishing, segregating, stockpiling, removing and loading. |
| 8.2 | Operate remote and/or pedestrian-operated demolition plant to demolish structures to given working instructions. |
| 8.3 | Segregate, stockpile, remove and load materials to given working instructions. |
| 8.4 | Safely use plant or machinery, hand tools, ancillary equipment and/or accessories. |
| 8.5 | Shut down and secure the plant or machinery to given instructions. |
| 8.6 | Safely store the materials, plant or machinery, tools and equipment used when demolishing structures using remote and/or pedestrian-operated demolition plant. |
| 8.7 | Describe how to apply safe work practices, follow procedures, report problems and establish authority needed to rectify, to: – identify the characteristics of the plant and machinery appropriate to the demolition and segregation operation – carry out performance checks for the demolition and segregation operation – identify the area to be demolished – carry out pre-operational checks for obstructions, safety and security of the work and surrounding area – check ground conditions to ensure the stability of plant or machinery during demolition activities – avoid damage to surrounding structures and utilities – demolish structures – segregate and safely remove materials into stockpiles and/or containers. |
| 8.8 | Describe how to apply safe work practices, follow procedures, report problems and establish authority needed to rectify, to: – shut down and secure plant or machinery – fit and remove attachments using direct and quick-hitch type couplers – use hand tools, ancillary equipment and accessories. |
| 8.9 | Describe the needs of other occupations and how to effectively communicate within a team when preparing for and carrying out demolishing operations. |
| 8.10 | Describe how to maintain the plant or machinery, tools and equipment used when demolishing structures using remote and/or pedestrian-operated demolition plant. |