| 1 | Interpret the given information relating to the work and resources when installing double-lap concrete roof slates. | 1.1 | Interpret and extract information from contractor’s working instructions. |
| 1.2 | Comply with information and/or instructions derived from risk assessments and method statement. |
| 1.3 | State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented. |
| 1.4 | Describe different types of information, their source and how they are interpreted in relation to: – contractor’s working instructions, manufacturers' information, regulations governing buildings, procedures for dealing with damaged and incorrect materials and/or resources. |
| 2 | Know how to comply with relevant legislation and official guidance when installing double-lap concrete roof slates. | 2.1 | Describe their responsibilities under current legislation and official guidance whilst working: – in the workplace, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting. |
| 2.2 | Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, company and operative. |
| 2.3 | State what the accident reporting procedures are and who is responsible for making reports. |
| 3 | Maintain safe working practices when installing double-lap concrete roof slates. | 3.1 | Use personal protective equipment (PPE) and access equipment/working platforms safely to carry out the activity in accordance with legislation and organisational requirements when installing double-lap concrete roof slates. |
| 3.2 | Explain why and when personal protective equipment (PPE) should be used, relating to installing double-lap concrete roof slates, and the types, purpose and limitations of each type. |
| 3.3 | State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards. |
| 4 | Select the required quantity and quality of resources for the methods of work to install double-lap concrete roof slates. | 4.1 | Describe the characteristics, quality, uses, limitations and defects associated with the resources in relation to: – concrete slates, fittings, fixings, soakers, ridge and hip tiles, battens, dry fix systems, mortar and ventilation systems – sand, cement and additives – hand and/or powered tools and ancillary equipment. |
| 4.2 | Select resources associated with own work in relation to materials, components, fixings, tools and equipment. |
| 4.3 | State how the resources should be used correctly, how problems associated with the resources are reported and how the organisational procedures are used. |
| 4.4 | Outline potential hazards associated with the resources and method of work. |
| 4.5 | Describe how to calculate quantity, length and area associated with the method/procedure to install double-lap concrete roof slates. |
| 5 | Minimise the risk of damage to the work and surrounding area when installing double-lap concrete roof slates. | 5.1 | Protect the work and its surrounding area from damage. |
| 5.2 | Minimise damage and maintain a clean work space. |
| 5.3 | Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions. |
| 5.4 | Dispose of waste in accordance with legislation. |
| 5.5 | State why the disposal of waste should be carried out in relation to the work. |
| 6 | Complete the work within the allocated time when installing double-lap concrete roof slates. | 6.1 | Demonstrate completion of the work within the allocated time. |
| 6.2 | State the purpose of the work programme and explain why deadlines should be kept in relation to: – types of work schedules/diaries, progress charts, timetables and estimated times – organisational procedures for reporting circumstances which will affect the work programme. |
| 7 | Comply with the given contract information to install double-lap concrete roof slates to the required specification. | 7.1 | Demonstrate the following work skills when installing double-lap concrete roof slates: – measuring, setting out, marking out, cutting, fitting, mixing, positioning, securing and finishing. |
| 7.2 | Install battens, double-lap concrete roof slates and related fittings, fixings and components to contractor’s working instructions, using new materials for roofs with: – verges and ridges – hips – valleys – eaves and tops course – abutments – openings – dry and/or sand and cement wet finishing details. |
| 7.3 | Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to: – assess suitability of sub-structure for re-roofing – set out battens for regular and/or diminishing courses for slates and components – install slates and components to eaves and tops course, verges, ridge, hips, valleys, openings and/or abutments, vertical and general areas – form dry and/or wet fix finishing details – mix sand and cement – mix mortar with additives – use hand tools, power tools and equipment – work at height – use access equipment. |
| 7.4 | Safely use and store hand tools, power tools and ancillary equipment. |
| 7.5 | State the needs of other occupations and how to communicate within a team when installing double-lap concrete roof slates. |
| 7.6 | Describe how to maintain the tools and equipment used when installing double-lap concrete roof slates. |