| 1 | Interpret the given information relating to the work and resources when preparing roof structures for thatching. | 1.1 | Interpret and extract information from drawings, specifications, schedules and manufacturers' information. |
| 1.2 | Comply with information and/or instructions derived from risk assessments and method statement. |
| 1.3 | State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented. |
| 1.4 | Describe different types of information, their source and how they are interpreted in relation to: – drawings, specifications, schedules, manufacturers' information and regulations governing buildings. |
| 2 | Know how to comply with relevant legislation and official guidance when preparing roof structures for thatching. | 2.1 | Describe their responsibilities under current legislation and official guidance whilst working: – in the workplace, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting. |
| 2.2 | Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, workplace, company and operative. |
| 2.3 | State what the accident reporting procedures are and who is responsible for making reports. |
| 2.4 | State the types of fire extinguishers available when preparing roof structures for thatching and describe how and when they are used. |
| 3 | Maintain safe working practices when preparing roof structures for thatching. | 3.1 | Use personal protective equipment (PPE) and access equipment safely to carry out the activity in accordance with legislation and organisational requirements when preparing roof structures for thatching. |
| 3.2 | Explain why and when personal protective equipment (PPE) should be used, relating to preparing roof structures for thatching, and the types, purpose and limitations of each type. |
| 3.3 | State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards. |
| 3.4 | Demonstrate the safe use of a fire extinguisher relevant to a typical fire associated with preparing roof structures for thatching as relevant to the operations. |
| 4 | Select the required quantity and quality of resources for the methods of work to prepare roof structures for thatching. | 4.1 | Describe the characteristics, quality, uses, limitations and defects associated with the resources in relation to: – timber, fixings, cleaning agents and timber treatments – hand and/or powered tools and equipment. |
| 4.2 | Select resources associated with own work in relation to materials, components, fixings, tools and equipment. |
| 4.3 | State how the resources should be used correctly, how problems associated with the resources are reported and how the organisational procedures are used. |
| 4.4 | Outline potential hazards associated with the resources and method of work. |
| 4.5 | Describe how to calculate quantity, length, area and wastage associated with the method/procedure to prepare roof structures for thatching. |
| 5 | Minimise the risk of damage to the work and surrounding area when preparing roof structures for thatching. | 5.1 | Protect the work and its surrounding area from damage. |
| 5.2 | Minimise damage and maintain a clean work space. |
| 5.3 | Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions. |
| 5.4 | Dispose of waste in accordance with legislation. |
| 5.5 | State why the disposal of waste should be carried out in relation to the work. |
| 6 | Complete the work within the allocated time when preparing roof structures for thatching. | 6.1 | Demonstrate completion of the work within the allocated time. |
| 6.2 | State the purpose of the work programme and explain why deadlines should be kept in relation to: – types of progress charts, timetables and estimated times – organisational procedures for reporting circumstances which will affect the work programme. |
| 7 | Comply with the given contract information to prepare roof structures for thatching to the required specification. | 7.1 | Demonstrate the following work skills when preparing roof structures for thatching: – measuring, marking out, removing and repairing. |
| 7.2 | Prepare thatching to given working instructions by: – removing existing thatch (full and/or partial) – reinforcing and making good roof structure – cleaning and treating roof structure. |
| 7.3 | Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to: – remove existing thatch (full or partial) – reinforce and make good roof structure – clean and treat roof structure – use hand tools, power tools and equipment – use access equipment. |
| 7.4 | Safely use and store hand tools, portable power tools and ancillary equipment. |
| 7.5 | State the needs of other occupations and how to communicate within a team when preparing roof structures for thatching. |
| 7.6 | Describe how to maintain the tools and equipment used when preparing roof structures for thatching. |