| 1 | Interpret the given information relating to the work and resources when installing components for warm roof construction. | 1.1 | Interpret and extract information from contractor’s working instructions. |
| 1.2 | Comply with information and/or instructions derived from risk assessments and method statement. |
| 1.3 | State the organisational procedures developed to report and rectify inappropriate information and unsuitable resources and how they are implemented. |
| 1.4 | Describe different types of information, their source and how they are interpreted in relation to: – contractor’s working instructions, manufacturers' information, regulations governing buildings, procedures for dealing with damaged and incorrect materials and/or resources. |
| 2 | Know how to comply with relevant legislation and official guidance when installing components for warm roof construction. | 2.1 | Describe their responsibilities under current legislation and official guidance whilst working: – in the workplace, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting. |
| 2.2 | Describe the organisational security procedures for tools, equipment and personal belongings in relation to site, company and operative. |
| 2.3 | State what the accident reporting procedures are and who is responsible for making reports. |
| 3 | Maintain safe working practices when installing components for warm roof construction. | 3.1 | Use personal protective equipment (PPE) and access equipment/working platforms safely to carry out the activity in accordance with legislation and organisational requirements when installing components for warm roof construction. |
| 3.2 | Explain why and when personal protective equipment (PPE) should be used, relating to installing components for warm roof construction, and the types, purpose and limitations of each type. |
| 3.3 | State how emergencies should be responded to in accordance with organisational authorisation and personal skills when involved with fires, spillages, injuries and other task-related hazards. |
| 4 | Select the required quantity and quality of resources for the methods of work to install components for warm roof construction. | 4.1 | Describe the characteristics, quality, uses, limitations and defects associated with the resources in relation to: – underlays, battens, counter-battens, insulation, ventilation systems, timber and batten stops – hand tools and ancillary equipment. |
| 4.2 | Select resources associated with own work in relation to materials, components, fixings, tools and equipment. |
| 4.3 | State how the resources should be used correctly, how problems associated with the resources are reported and how the organisational procedures are used. |
| 4.4 | Outline potential hazards associated with the resources and method of work. |
| 4.5 | Describe how to calculate quantity, length and area associated with the method/procedure to install components for warm roof construction. |
| 5 | Minimise the risk of damage to the work and surrounding area when installing components for warm roof construction. | 5.1 | Protect the work and its surrounding area from damage. |
| 5.2 | Minimise damage and maintain a clean work space. |
| 5.3 | Describe how to protect work from damage and the purpose of protection in relation to general workplace activities, other occupations and adverse weather conditions. |
| 5.4 | Dispose of waste in accordance with legislation. |
| 5.5 | State why the disposal of waste should be carried out in relation to the work. |
| 6 | Complete the work within the allocated time when installing components for warm roof construction. | 6.1 | Demonstrate completion of the work within the allocated time. |
| 6.2 | State the purpose of the work programme and explain why deadlines should be kept in relation to: – types of work schedules/diaries, progress charts, timetables and estimated times – organisational procedures for reporting circumstances which will affect the work programme. |
| 7 | Comply with the given contract information to install components for warm roof construction to the required specification. | 7.1 | Demonstrate the following work skills when installing components for warm roof construction: – measuring, cutting, marking out, fitting, positioning and securing. |
| 7.2 | Install warm roof components to roofs with ridges, verges, hips and valleys and abutments to contractor’s working instructions for: – underlay, battens and counter-battens – ventilation systems – rafter level insulation – batten stops – supporting timbers (valleys, hips, ridges, abutments and openings) – ancillary components. |
| 7.3 | Describe how to apply safe work practices, follow procedures, report problems and establish the authority needed to rectify them, to: – fix underlay to roof design, battens and counter-battens – install ventilation systems – form warm roofs – install rafter level insulation – install batten stops – install supporting timber at hips, valleys, ridges, abutments and openings – install vapour control layers – use hand tools and ancillary equipment – work at height – use access equipment. |
| 7.4 | Safely use and store hand tools, power tools and ancillary equipment. |
| 7.5 | State the needs of other occupations and how to communicate within a team when installing components for warm roof construction. |
| 7.6 | Describe how to maintain the tools and equipment used when installing components for warm roof construction. |